Scheduling on a batch machine with job compatibilities M Boudhar, G Finke JORBEL-Belgian Journal of Operations Research, Statistics, and Computer …, 2000 | 59 | 2000 |
Branch-and-bound and PSO algorithms for no-wait job shop scheduling A AitZai, B Benmedjdoub, M Boudhar Journal of Intelligent Manufacturing 27, 679-688, 2016 | 54 | 2016 |
Scheduling jobs on identical machines with agreement graph M Bendraouche, M Boudhar Computers & operations research 39 (2), 382-390, 2012 | 33 | 2012 |
A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blocking A AitZai, B Benmedjdoub, M Boudhar International Journal of Operational Research 14 (3), 343-365, 2012 | 32 | 2012 |
Scheduling a batch processing machine with bipartite compatibility graphs M Boudhar Mathematical Methods of Operations Research 57, 513-527, 2003 | 29 | 2003 |
Parallel branch-and-bound and parallel PSO algorithms for job shop scheduling problem with blocking A AitZai, M Boudhar International Journal of Operational Research 16 (1), 14-37, 2013 | 28 | 2013 |
Scheduling on parallel machines with preemption and transportation delays A Haned, A Soukhal, M Boudhar, NH Tuong Computers & Operations Research 39 (2), 374-381, 2012 | 27 | 2012 |
Preemptive scheduling in the presence of transportation times M Boudhar, A Haned Computers & operations research 36 (8), 2387-2393, 2009 | 27 | 2009 |
Open shop scheduling problems with conflict graphs NEH Tellache, M Boudhar Discrete Applied Mathematics 227, 103-120, 2017 | 25 | 2017 |
Scheduling identical jobs on uniform machines with a conflict graph A Mallek, M Bendraouche, M Boudhar Computers & Operations Research 111, 357-366, 2019 | 23 | 2019 |
Flow shop scheduling problem with conflict graphs NEH Tellache, M Boudhar Annals of Operations Research 261, 339-363, 2018 | 23 | 2018 |
Dynamic scheduling on a single batch processing machine with split compatibility graphs M Boudhar Journal of Mathematical Modelling and Algorithms 2 (1), 17-35, 2003 | 23 | 2003 |
Scheduling: Agreement graph vs resource constraints M Bendraouche, M Boudhar, A Oulamara European Journal of Operational Research 240 (2), 355-360, 2015 | 22 | 2015 |
Two‐stage hybrid flow shop with recirculation M Boudhar, N Meziani International Transactions in Operational Research 17 (2), 239-255, 2010 | 21 | 2010 |
Multiobjective approach for deteriorating jobs scheduling for a sustainable manufacturing system M Tigane, M Dahane, M Boudhar The International Journal of Advanced Manufacturing Technology 101, 1939-1957, 2019 | 20 | 2019 |
Chain-reentrant shop with an exact time lag: new results K Amrouche, M Boudhar, M Bendraouche, F Yalaoui International Journal of Production Research 55 (1), 285-295, 2017 | 19 | 2017 |
Two machines flow shop with reentrance and exact time lag K Amrouche, M Boudhar RAIRO-Operations Research-Recherche Opérationnelle 50 (2), 223-232, 2016 | 18 | 2016 |
Two-machine flow shop problem with unit-time operations and conflict graph NEH Tellache, M Boudhar International Journal of Production Research 55 (6), 1664-1679, 2017 | 17 | 2017 |
PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations N Meziani, M Boudhar, A Oulamara European Journal of Industrial Engineering 12 (1), 43-66, 2018 | 16 | 2018 |
Scheduling on a batch processing machine with split compatibility graphs M Boudhar Journal of Mathematical Modelling and Algorithms 4, 391-407, 2005 | 16 | 2005 |