A survey of the state-of-the-art of common due date assignment and scheduling research V Gordon, JM Proth, C Chu European Journal of Operational Research 139 (1), 1-25, 2002 | 607 | 2002 |
A survey of scheduling with deterministic machine availability constraints Y Ma, C Chu, C Zuo Computers & Industrial Engineering 58 (2), 199-211, 2010 | 494 | 2010 |
A planning and scheduling problem for an operating theatre using an open scheduling strategy H Fei, N Meskens, C Chu Computers & Industrial Engineering 58 (2), 221-230, 2010 | 380 | 2010 |
A survey of models and algorithms for optimizing shared mobility A Mourad, J Puchinger, C Chu Transportation Research Part B: Methodological 123, 323-346, 2019 | 326 | 2019 |
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints N Wu, C Chu, F Chu, MC Zhou IEEE Transactions on Semiconductor Manufacturing 21 (2), 224-237, 2008 | 258 | 2008 |
Recent advances and opportunities in sustainable food supply chain: a model-oriented review Z Zhu, F Chu, A Dolgui, C Chu, W Zhou, S Piramuthu International Journal of Production Research 56 (17), 5700-5722, 2018 | 249 | 2018 |
Reliability allocation through cost minimization AOC Elegbede, C Chu, KH Adjallah, F Yalaoui IEEE Transactions on reliability 52 (1), 106-111, 2003 | 243 | 2003 |
Cyclic scheduling of a hoist with time window constraints H Chen, C Chu, JM Proth IEEE Transactions on Robotics and Automation 14 (1), 144-152, 1998 | 234 | 1998 |
Solving surgical cases assignment problem by a branch-and-price approach H Fei, C Chu, N Meskens, A Artiba International journal of production economics 112 (1), 96-108, 2008 | 212 | 2008 |
Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting NQ Wu, F Chu, C Chu, MC Zhou IEEE Transactions on Systems, Man, and Cybernetics: Systems 43 (1), 196-207, 2012 | 196 | 2012 |
The study of a dynamic dial-a-ride problem under time-dependent and stochastic environments Z Xiang, C Chu, H Chen European Journal of Operational Research 185 (2), 534-551, 2008 | 195 | 2008 |
Solving a tactical operating room planning problem by a column-generation-based heuristic procedure with four criteria H Fei, C Chu, N Meskens Annals of Operations Research 166, 91-108, 2009 | 188 | 2009 |
Urban freight transport using passenger rail network: Scientific issues and quantitative analysis W Behiri, S Belmokhtar-Berraf, C Chu Transportation Research Part E: Logistics and Transportation Review 115, 227-245, 2018 | 175 | 2018 |
Newsvendor model for a dyadic supply chain with Nash bargaining fairness concerns S Du, T Nie, C Chu, Y Yu International Journal of Production Research 52 (17), 5070-5085, 2014 | 173 | 2014 |
A fast heuristic for solving a large-scale static dial-a-ride problem under complex constraints Z Xiang, C Chu, H Chen European journal of operational research 174 (2), 1117-1139, 2006 | 170 | 2006 |
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes NQ Wu, F Chu, C Chu, MC Zhou IEEE Transactions on Automation Science and Engineering 8 (1), 42-55, 2010 | 166 | 2010 |
Parallel machine scheduling to minimize total tardiness F Yalaoui, C Chu International journal of production economics 76 (3), 265-279, 2002 | 161 | 2002 |
A branch‐and‐bound algorithm to minimize total tardiness with different release dates C Chu Naval Research Logistics (NRL) 39 (2), 265-283, 1992 | 158 | 1992 |
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times DN Tahar, F Yalaoui, C Chu, L Amodeo International journal of production economics 99 (1-2), 63-73, 2006 | 156 | 2006 |
Reliability allocation problem in a series–parallel system A Yalaoui, C Chu, E Chatelet Reliability engineering & system safety 90 (1), 55-61, 2005 | 151 | 2005 |