A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling M Ranjbar, B De Reyck, F Kianfar European Journal of Operational Research 193 (1), 35-48, 2009 | 196 | 2009 |
Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm M Ranjbar, F Kianfar, S Shadrokh Applied Mathematics and Computation 196 (2), 879-888, 2008 | 111 | 2008 |
Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms MR Ranjbar, F Kianfar Applied Mathematics and Computation 191 (2), 451-456, 2007 | 65 | 2007 |
Solving the resource-constrained project scheduling problem using filter-and-fan approach M Ranjbar Applied mathematics and computation 201 (1-2), 313-318, 2008 | 54 | 2008 |
A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions N Jamili, M Ranjbar, M Salari Journal of Manufacturing Systems 40, 105-118, 2016 | 52 | 2016 |
Two branch-and-bound algorithms for the robust parallel machine scheduling problem M Ranjbar, M Davari, R Leus Computers & Operations Research 39 (7), 1652-1660, 2012 | 52 | 2012 |
An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem M Ranjbar, M Khalilzadeh, F Kianfar, K Etminani Computers & Industrial Engineering 62 (1), 264-270, 2012 | 43 | 2012 |
Resource-constrained project scheduling problem with flexible work profiles: a genetic algorithm approach M Ranjbar, F Kianfar SCIENTIA IRANICA 17 (1), 25-35, 2010 | 39 | 2010 |
A two-stage stochastic programming approach for a multi-objective course timetabling problem with courses cancelation risk P Yasari, M Ranjbar, N Jamili, MH Shaelaie Computers & Industrial Engineering 130, 650-660, 2019 | 38 | 2019 |
A hybrid metaheuristic for concurrent layout and scheduling problem in a job shop environment M Ranjbar, MN Razavi The International Journal of Advanced Manufacturing Technology 62, 1249-1260, 2012 | 34 | 2012 |
Maximizing the expected net present value in a project with uncertain cash flows M Peymankar, M Davari, M Ranjbar European Journal of Operational Research, 2021 | 33 | 2021 |
Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem RG Saber, M Ranjbar Computers & Operations Research 138, 105604, 2022 | 32 | 2022 |
Multi-mode renewable resource-constrained allocation in PERT networks S Baradaran, SMTF Ghomi, M Ranjbar, SS Hashemin Applied Soft Computing 12 (1), 82-90, 2012 | 32 | 2012 |
A path-relinking metaheuristic for the resource levelling problem M Ranjbar Journal of the Operational Research Society 64 (7), 1071-1078, 2013 | 29 | 2013 |
A modified PSO algorithm for minimizing the total costs of resources in MRCPSP M Khalilzadeh, F Kianfar, A Shirzadeh Chaleshtari, S Shadrokh, ... Mathematical Problems in Engineering 2012 (1), 365697, 2012 | 27 | 2012 |
Minimizing total weighted late work in the resource-constrained project scheduling problem M Ranjbar, S Hosseinabadi, F Abasian Applied Mathematical Modelling 37 (23), 9776-9785, 2013 | 26 | 2013 |
A HYBRID SCATTER SEARCH FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP) M Ranjbar, F Kianfar SCIENTIA IRANICA 16 (1), 11-18, 2009 | 24 | 2009 |
Scheduling of loading and unloading operations in a multi stations transshipment terminal with release date and inventory constraints A Bazgosha, M Ranjbar, N Jamili Computers & Industrial Engineering 106, 20-31, 2017 | 22 | 2017 |
Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints M Ghorbanzadeh, M Ranjbar European Journal of Operational Research, 2023 | 19 | 2023 |
An exact method for scheduling of the alternative technologies in R&D projects M Ranjbar, M Davari Computers & operations research 40 (1), 395-405, 2013 | 18 | 2013 |