Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets B Ashtiani, F Haghighirad, A Makui, G ali Montazer Applied Soft Computing 9 (2), 457-461, 2009 | 528 | 2009 |
A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method A Ahi, MB Aryanezhad, B Ashtiani, A Makui Computers & Operations Research 36 (5), 1478-1496, 2009 | 162 | 2009 |
New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre-processing B Ashtiani, R Leus, MB Aryanezhad Journal of Scheduling 14, 157-171, 2011 | 148 | 2011 |
A new approach for buffer sizing in critical chain scheduling B Ashtiani, GR Jalali, MB Aryanezhad, A Makui 2007 IEEE International conference on industrial engineering and engineering …, 2007 | 70 | 2007 |
Critical chain project scheduling: Utilizing uncertainty for buffer sizing M Fallah, B Ashtiani, MB Aryanezhad International Journal of Research and Reviews in Applied Sciences 3 (3), 280-289, 2010 | 49 | 2010 |
Multi-start simulated annealing for dynamic plant layout problem B Ashtiani, MB Arianezhad, MB FARHANG JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL 3 (4), 44-50, 2007 | 18 | 2007 |
Preemptive resource constrained project scheduling problem with uncertain resource availabilities: Investigate worth of proactive strategies M Fallah, MB Aryanezhad, B Ashtiani 2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010 | 6 | 2010 |
ali Montazer G B Ashtiani, F Haghighirad, A Makui Extension of fuzzy TOPSIS method based on interval-valued fuzzy sets …, 2009 | 6 | 2009 |
A novel class of scheduling policies for the stochastic resource-constrained project scheduling problem B Ashtiani, R Leus, MB Aryanezhad Available at SSRN 1368714, 2008 | 5 | 2008 |
Mir. B. Aryanezhad, Behzad Ashtiani and Ahmad Makui,“A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on … A Ahi Computers & Operations Research 36 (5), 1478-1496, 2009 | 4 | 2009 |
Chaos in production planning F Haghighirad, A Makui, B Ashtiani Journal of Applied Mathematic and Informatics 26 (3-4), 739-750, 2008 | 3 | 2008 |
Qualitative Evaluation and Selecting the Optimum Public Private Partnership System for Transportation B Farhang Moghaddam, AA Fatahi International Journal of Research in Industrial Engineering 2 (2), 61-69, 2013 | 2 | 2013 |
Time-cost-resource optimization of resource constrained project scheduling problem with discounted cash flows using multi-objective gravitational search algorithm F Paidar, B Ashtiani, R Tavakkoli Moghaddam Int. J. Ind. Eng. Prod. Manag 28, 1-14, 2017 | 1 | 2017 |
Production planning under variable buffer size M Fallah, B Ashtiani, M ARYANEZHAD, A AFSHARI Kuwait Journal of Science and Engineering 38 (1), 211-226, 2011 | 1 | 2011 |
An investigation on the multiple attribute decision making (MADM) methods for solving the cell formation problem A Ahi, B Ashtiani, MB Aryanezhad, A Makui 2007 IEEE International Conference on Industrial Engineering and Engineering …, 2007 | 1 | 2007 |
A HEURISTIC METHOD FOR SOLVING CELL FORMATION PROBLEM BASED ON P-MEDIAN MODEL B ASHTIANI, H HOSSEINIAN, M RANJBAR, MIRB ARYANEZHAD | | 2008 |
journal homepage: www. elsevier. com/locate/asoc A Abraham, V Achim, H Ahn, S Aine, CH Aladag, M Albakoor, L Ali, ... | | |
شیک هاگشناد B Ashtiani, H Hosseinian, M Ranjbar, MB Aryanezhad | | |