Spremljaj
Tihomir Opetuk
Tihomir Opetuk
University of Zagreb Faculty of Mechanical Engineering and Naval Architecture
Preverjeni e-poštni naslov na fsb.unizg.hr - Domača stran
Naslov
Navedeno
Navedeno
Leto
Order-picking methods and technologies for greener warehousing
G Đukić, V Česnik, T Opetuk
Strojarstvo: časopis za teoriju i praksu u strojarstvu 52 (1), 23-31, 2010
1192010
A throughput model for a dual-tray Vertical Lift Module with a human order-picker
G Dukic, T Opetuk, T Lerher
International journal of production economics 170, 874-881, 2015
592015
SIMULATION-BASED PERFORMANCE ANALYSIS OF AUTOMATED SINGLE-TRAY VERTICAL LIFT MODULE.
B Rosi, L Grasic, G Dukic, T Opetuk, T Lerher
International Journal of Simulation Modelling (IJSIMM) 15 (1), 2016
372016
Warehouse layouts
G Dukic, T Opetuk
Warehousing in the Global Supply Chain: Advanced Models, Tools and …, 2012
342012
Process planning in Industry 4.0—Current state, potential and management of transformation
M Trstenjak, T Opetuk, H Cajner, N Tosanovic
Sustainability 12 (15), 5878, 2020
332020
The impact of the applied technology on health and productivity in manual “picker-to-part” systems
B Gajšek, G Ðukić, M Butlewski, T Opetuk, H Cajner, SM Kač
Work 65 (3), 525-536, 2020
272020
Analysis of order-picking in warehouses with fishbone layout
G Dukic, T Opetuk
Proceedings of ICIL 8, 2008
252008
Industry 4.0 readiness calculation—transitional strategy definition by decision support systems
M Trstenjak, T Opetuk, H Cajner, M Hegedić
Sensors 22 (3), 1185, 2022
202022
Optimization of the plant layout in the production of the special transformers: Case study
D Belić, Z Kunica, T Opetuk, G Dukic
FME Transactions 46 (2), 285-290, 2018
172018
Human in manual order picking systems
B Gajšek, G Đukić, T Opetuk, H Cajner
Conference proceedings-management of technology–step to sustainable production, 2017
172017
Using digital twin in a shipbuilding project
Z Kunkera, T Opetuk, N Hadžić, N Tošanović
Applied Sciences 12 (24), 12721, 2022
142022
Greening Elements in the Distribution Networks
G Opetuk, T., Žolo, I., Đukić
Management of Technology Step to Sustainable Production MOTSP 2010, 2010
12*2010
Greening elements in the distribution networks
T Opetuk, I Zolo, G Dukic
Journal of Industrial Engineering and Management 3 (2), 353-369, 2010
122010
Industry 4.0 readiness factor calculation and process planning: State-of-the-art review
M Trstenjak, T Opetuk
Transactions of FAMENA 44 (3), 1-22, 2020
102020
Industry 4.0 readiness factor calculation: Criteria evaluation framework
M Trstenjak, H Cajner, T Opetuk
FME Transactions 47 (4), 841-845, 2019
102019
A Finite State Method in improvement and design of lean Bernoulli serial production lines
N Hadžić, V Ložar, T Opetuk, J Andrić
Computers & industrial engineering 159, 107449, 2021
92021
Application of multi criteria decision making methods for readiness factor calculation
M Trstenjak, D Lisjak, T Opetuk, D Pavković
IEEE EUROCON 2019-18th International Conference on Smart Technologies, 1-6, 2019
92019
Model uvođenja upravljanja zelenim lancima opskrbe
T Opetuk
University of Zagreb. Faculty of Mechanical Engineering and Naval Architecture, 2016
92016
Space, time and ergonomic assessment of order-picking using vertical lift modules
G Đukić, L Rose, B Gajšek, T Opetuk, H Cajner
14th International Conference on Industrial Logistics, 68-74, 2018
82018
Logistics 5.0 Implementation Model Based on Decision Support Systems
M Trstenjak, T Opetuk, G Đukić, H Cajner
Sustainability 14 (11), 6514, 2022
72022
Sistem trenutno ne more izvesti postopka. Poskusite znova pozneje.
Članki 1–20