Bi-objective ant colony optimization approach to optimize production and maintenance scheduling A Berrichi, F Yalaoui, L Amodeo, M Mezghiche Computers & Operations Research 37 (9), 1584-1596, 2010 | 233 | 2010 |
Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem A Berrichi, L Amodeo, F Yalaoui, E Châtelet, M Mezghiche Journal of Intelligent Manufacturing, Springer 20 (4), 389, 2009 | 189 | 2009 |
Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem A Berrichi, F Yalaoui The International Journal of Advanced Manufacturing Technology, Springer 68 …, 2013 | 57 | 2013 |
Minimize total tardiness and machine unavailability on single machine scheduling problem: bi-objective branch and bound algorithm A Khoudi, A Berrichi Operational Research International Journal, Springer, 1-27, 2018 | 13 | 2018 |
Gabriel graph-based connectivity and density for internal validity of clustering F Boudane, A Berrichi Progress in Artificial Intelligence 10 (1), 2020 | 7 | 2020 |
Bi objective artificial immune algorithms to the joint production scheduling and maintenance planning A Berrichi, F Yalaoui IEEE International Conference on Control, Decision and Information …, 2013 | 6 | 2013 |
Branch and Bound algorithm for identical parallel machine scheduling problem to maximize system availability A Khoudi, A Berrichi International Journal of Manufacturing Research, 2019 | 4 | 2019 |
Fuzzy Rules for Joint Integration of Production Schedule and Maintenance Planning. A Berrichi, F Yalaoui, A Yalaoui Journal of Multiple-Valued Logic & Soft Computing 26 (6), 2016 | 4 | 2016 |
Variable neighborhood search for automatic density-based clustering F Boudane, A Berrichi IEEE International Conference on Mathematics and Information Technology, 2017 | 3 | 2017 |
Pareto ant colony optimization based algorithm to solve maintenance and production scheduling problem in parallel machine case A Berrichi, M Mezghiche, L Amodeo, F Yalaoui 39th IEEE International Conference on Computers & Industrial Engineering …, 2009 | 3 | 2009 |
Multi-objective artificial bee colony algorithm for parameter-free neighborhood-based clustering F Boudane, A Berrichi International Journal of Swarm Intelligence Research (IJSIR) 12 (4), 186-204, 2021 | 1 | 2021 |
Heuristics to maximize system availability on parallel machine scheduling problem A Khoudi, A Berrichi, F Yalaoui 12th IEEE International Symposium on Programming and Systems (ISPS), 1-6, 2015 | 1 | 2015 |
La gestion à deux niveau avec optimisation de la production et de la maintenance sous diverses contraintes: cas mom et multicritére A BERRICH Université de Boumerdès-M'hamed Bougara, 2009 | 1 | 2009 |
Machine Learning in the Medical Field: A Comprehensive Overview A Belgacem, A Khoudi, F Boudane, A Berrichi 2023 International Conference on Decision Aid Sciences and Applications …, 2023 | | 2023 |
Grey Wolf Optimizer with Multi Step Crossover for Bi-objective Job Shop Scheduling Problem S Gunadiz, A Berrichi International Conference on Computing Systems and Applications, 261-272, 2022 | | 2022 |
Maximizing system availabuility on parallel machine scheduling problem A Khoudi, A Berrichi, F Yalaoui ISPS 2015: 12th International Symposium on Programming and Systems, 2015 | | 2015 |
Bi-objective branch and bound algorithms to minimize total tardiness and system unavailability on single machine problem A Khoudi, A Berrichi, F Yalaoui ORPA'2015: Operational Research Practice in Africa Conference 2015, 2015 | | 2015 |
Branch and bound algorithm to maximize system availability in parallel machines scheduling problem. A Khoudi, A Berrichi, M Boudhar, F Yalaoui Colloque sur l'Optimisation et les Systèmes d'Information, COSI'2014, 2014 | | 2014 |
Fuzzy rules for the integration of maintenance activities in the joint scheduling of production and maintenance Planning A Berrichi, F Yalaoui IESM 2013, 5th International Conference on Industrial Engineering and …, 2013 | | 2013 |
Multi‐Objective Metaheuristics for the Joint Scheduling of Production and Maintenance A Berrichi, F Yalaoui Metaheuristics for Production Scheduling, 283-313, 2013 | | 2013 |